Exam 300-101: CCNP ROUTE
Skills Measured:
Implement an EIGRP based solution, given a network design and a set of requirements
- Determine network resources needed for implementing EIGRP in a network
- Create an EIGRP implementation plan
- Create an EIGRP verification plan
- Configure EIGRP routing
- Verify an EIGRP solution was implemented properly using show and debug commands
- Document the verification results for an EIGRP implementation
Implement a multi-area OSPF Network, given a network design and a set of requirements
- Determine network resources needed for implementing OSPF on a network
- Create an OSPF implementation plan
- Create an OSPF verification plan
- Configure OSPF routing
- Verify OSPF solution was implemented properly using show and debug commands
- Document the verification results for an OSPF implementation plan
Implement an eBGP based solution, given a network design and a set of requirements
- Determine network resources needed for implementing eBGP on a network
- Create an eBGP implementation plan
- Create an eBGP verification plan
- Configure eBGP routing
- Verify eBGP solution was implemented properly using show and debug commands
- Document verification results for an eBGP implementation plan
Implement an IPv6 based solution, given a network design and a set of requirements
- Determine network resources needed for implementing IPv6 on a network
- Create an IPv6 implementation plan
- Create an IPv6 verification plan
- Configure IPv6 routing
- Configure IPv6 interoperation with IPv4
- Verify IPv6 solution was implemented properly using show and debug commands
- Document verification results for an IPv6 implementation plan
Implement an IPv4 or IPv6 based redistribution solution, given a network design and a set of requirements
- Create a redistribution implementation plan based upon the results from a redistribution analysis
- Create a redistribution verification plan
- Configure a redistribution solution
- Verify that a redistribution was implemented
- Document results of a redistribution implementation and verification plan
- Identify the differences between implementing an IPv4 and IPv6 redistribution solution
Implement Layer 3 Path Control Solution
- Create a Layer 3 path control implementation plan based upon the results of the redistribution analysis
- Create a Layer 3 path control verification plan
- Configure Layer 3 path control
- Verify that a Layer 3 path control was implemented
- Document results of a Layer 3 path control implementation and verification plan
- Implement basic teleworker and branch services
- Describe broadband technologies
- Configure basic broadband connections
- Describe basic VPN technologies
- Configure GRE
- Describe branch access technologies